Longstone MLD Primary School.
J & J Carter were contracted by Graham Construction to design and build two tensile canopies linking various departments within the Longstone MLD School complex. Works at Longstone consisted of a special needs school building - part single and part two-storey, a separate gym building and adjoining all-weather astro pitch.

The school and gym buildings are of a highly contemporary design, with both being erected using a combination of traditional steel frame and timber kit techniques. The internal features of both of the buildings include soft play and sensory rooms make them ideal learning spaces for kids with mild learning disabilities.

Canopy extends from 2.5m to 4.5m span at Longstone, providing a total of 70 sq.m of covered walkway.

Corner bay changes the orientation of the barrel vault roof; by implementing a twist.

