Case Studies

Please select a category below to view one of our sector-specific case studies.

Please use the fields below for a more advanced search of our portfolio

Materials
Structures
Roof Form

RELATED CASE STUDIES

The Mill House Hotel

The Mill House Hotel

J & J Carter were contracted by Loddon Hotel Ltd., owners of The Mill House Hotel to replace their existing 38 year old marquee facility with a modern structure.

Read more
The Malls

The Malls

The Basingstoke improvement works included the installation of a clear roof canopy and removing heavy over-hanging concrete canopies.

Download Read more
Oxford Brookes Climbing Wall

Oxford Brookes Climbing Wall

J & J Carter worked with Oxford Brookes to create a high quality ‘Sport Rock Solid Climbing Wall’ which included a bouldering room, bottom rope wall and Walltopia lead tower.

Read more
Sandown Park Racecourse

Sandown Park Racecourse

As part of a multi-million pound refurbishment program to the Parade Ring, J & J Carter was tasked with designing, manufacturing and installing a canopy covering part of the stand area.

Read more
Sharp Lane Primary School

Sharp Lane Primary School

During the project’s design phase it became clear that there were a number of compatibility issues between the proposed tensile fabric structure and the existing building which needed to be resolved.

Download Read more
Oxclose Community School

Oxclose Community School

As part of a refurbishment programme commissioned by Sunderland City Council, J & J Carter were appointed as specialist contractors for the design and build of a tensile fabric entrance canopy.

Download Read more
Woodley Town Centre

Woodley Town Centre

Woodley Town Council was given approval to refresh the northern end of the town centre to make it a more flexible space for traders.

Read more
Sunderland AFC's Beacon of Light

Sunderland AFC's Beacon of Light

J & J Carter have been appointed by Tolent Construction to design, manufacture and install a 4000m2 PVC tensile fabric roof for Sunderland AFC’s Beacon of Light.

Read more
Samuel Ryder Academy

Samuel Ryder Academy

The client required two new canopies to create an attractive courtyard in the Academy.

Read more
Sterts Theatre

Sterts Theatre

In 1994, a second-hand canopy was purchased to cover the amphitheatre. However, as this canopy was not custom-made for Sterts there had always been issues with wind and rain getting under the sides.

Read more
The Lights Theatre

The Lights Theatre

J & J Carter were appointed to create and install the canopy to the exterior of the building.

Download Read more
Kilworth House Hotel

Kilworth House Hotel

The site for the auditorium was a wooded glade in the grounds of the hotel, which presented challenging build circumstances.

Download Read more
Stourbridge Interchange Bus Station

Stourbridge Interchange Bus Station

The £7 million contract has successfully delivered world class facilities including two tensile canopies built by J & J Carter.

Download Read more
Butlin's Skegness

Butlin's Skegness

J & J Carter were asked to manufacture canopies and the steelwork to cover the drive-through entrance kiosks of the Butlin's holiday park.

Read more
Hickstead Stables

Hickstead Stables

J & J Carter completed the design and manufacture of a modular curved roof structure, including the textile membrane, for the temporary stables.

Read more
Laureus Awards

Laureus Awards

J & J Carter manufactured some 400 m2 of Clear PVC Roofing for the 2010 Laureus Awards in Abu Dhabi. This structure was erected at the Emirates Palace, with the awards televised worldwide.

Read more
Eco - Dam Deployment

Eco - Dam Deployment

The Eco-Dam is being used as a cofferdam to hold back water. We provided the anchorage system also to hold the barrier either side of the ditch.

Download Read more